20  Oil & Gas Onboarding Questionnaire

Kav AI Onboarding & Asset Monitoring Assessment

Welcome to the Kav AI onboarding process. This questionnaire helps us understand your oil and gas facility, pipeline network, storage systems, and operational requirements. Your responses will enable us to configure our autonomous monitoring solution to your assets and demonstrate value quickly.

Please complete all sections as thoroughly as possible. Confidential information will be protected in accordance with our non-disclosure agreement (NDA).


20.1 Organization Information

  • Company / Operator Name: _____________________________________________
  • Division / Business Unit: _____________________________________________
  • Primary Contact Name & Title: ________________________________________
  • Primary Contact Email & Phone: _______________________________________
  • Secondary Contact Name & Email: _____________________________________
  • Headquarters Address: _________________________________________________

20.2 Asset & Facility Overview

20.2.1 Industry Segment

Select all segments that apply to the target assets:

20.2.2 Target Facility Details

  • Facility / Asset Name & Site ID: _______________________________________
  • Physical Location (GPS or City, State/Province, Country): _________________
  • Geographical Span (e.g., pipeline length in miles/km, total acreage): ________
  • Year Built & Age of Major Infrastructure: _______________________________
  • Daily Throughput Capacity (e.g., bpd, mmcfd, tons/day): __________________
  • Operating Hours & Staffing (e.g., 24/7 continuous, unmanned remote): _______
  • Number of Remote Sites / Wellheads / Valve Stations: ____________________

20.2.3 Asset Inventory

Check all asset types that will be monitored by the Kav AI platform:


20.3 Distributed Sites and Remote Assets

Many oil and gas operations rely on a vast network of remote and unmanned assets. Please describe your remote site landscape below:

  • Total Number of Unmanned Sites: ______________________________________
  • Geographic Coverage Area (sq. miles/km): ______________________________
  • Typical Communication Backhaul (Cellular LTE, Satellite, Licensed Radio, Fiber): _________________
  • Average Distance / Travel Time Between Sites: ___________________________
  • Current Remote Monitoring Capabilities: _________________________________

20.3.1 Remote Site Challenges

Check all operational challenges you experience with distributed assets:


20.4 Extreme Weather & Pipeline Event Operations

Kav AI overlays real-time weather and environmental data with asset telemetry to provide advanced situational awareness.

  • What weather triggers are most critical for your assets? (e.g., freeze-offs, hurricanes, extreme wind, lightning) __________________________________________________________________________

  • How are pipeline valve closures or system shut-ins decided during weather events? __________________________________________________________________________

  • What data sources do operators currently correlate under high-pressure events? __________________________________________________________________________

20.4.1 Weather & Operational Pain Points

Check all challenges that impact your operations during weather or pressure upsets:


20.5 Control Systems & OT Infrastructure

20.5.1 SCADA, DCS, & Historian

  • SCADA/DCS Vendor & Product Name: ____________________________________
  • SCADA/DCS Software Version & Year: _________________________________
  • Historian in Use (e.g., OSISoft PI, AspenTech IP21, Honeywell PHD): _________
  • Data Polling and Archival Frequency (e.g., 1s, 5s, 10s): _________________

20.5.2 PLC & Flow Computer Inventory

List primary controller types (e.g., Allen-Bradley ControlLogix, Siemens S7-1500, Emerson ROC, ABB Totalflow):

  • Controller Vendor & Model: ___________________________________________
  • Approximate Quantity: _______________________________________________
  • Age Range: ___________________________________________________________

20.5.3 Communication Protocols

Check all protocols supported by your control networks:


20.6 Alarm Management & Operator Workflows

20.6.1 Alarm Volume & Fatigue

  • Approximate Number of Configured Alarms: ______________________________
  • Average Alarms per Day (Normal Operations): ___________________________
  • Average Alarms per Day (Upset Conditions / Storms): ___________________
  • Estimated Percentage of “Nuisance” Alarms: ________%

20.6.2 Operator Workflow Challenges

Check all issues that impact your control room operators:


20.7 Security, Network Architecture & Compliance

Kav AI utilizes a read-only, security-first integration architecture to guarantee that no control actions can be back-propagated into your OT environment.

20.7.1 Security Posture

  • Is there physical and logical OT/IT network segmentation? [ ] Yes [ ] No
  • Is there a Demilitarized Zone (DMZ) with a jump host? [ ] Yes [ ] No
  • Firewall Vendor(s) in Use: ____________________________________________
  • Do you allow outbound-only connections to secure cloud platforms? [ ] Yes [ ] No

20.7.2 Cybersecurity & Industry Standards

Check all standards that apply to your asset cybersecurity review:


20.8 Data Governance & Sovereignty

  • Are there geographical residency requirements for your operational data? __________________________________________________________________________

  • What is your mandatory data retention period for historical telemetry and video? __________________________________________________________________________

  • Do process recipes, field layouts, or telemetry labels contain proprietary trade secrets? __________________________________________________________________________


20.9 Operational Metrics (ROI Baseline)

To measure the ROI of the Kav AI platform, we establish a baseline using your historical metrics. Estimates are acceptable where precise figures are unavailable.

  • Unplanned Facility / Line Downtime Incidents per Year: __________________
  • Average Duration of a Downtime Event (Hours): _________________________
  • Estimated Cost per Hour of Production Downtime ($/hr): _________________
  • Number of Emergency Field Callouts (Roll-offs) per Month: ________________
  • Percentage of Maintenance Budget Spent on Reactive / Emergency Repairs: _____%
  • Annual Cost of Regulatory Environmental Fines / Methane Audits: _________

20.10 Inspection Practices & Sensor Capabilities

20.10.1 Inspection Methods

Check all methods currently used to assess asset integrity:

20.10.2 Asset Monitoring Equipment Inventory

Please list equipment owned or contracted:

  • UAV / Drone Platforms: ________________________________________________
  • Thermal / IR Cameras: _________________________________________________
  • OGI Cameras: __________________________________________________________
  • Continuous Gas Detection Sensors: _______________________________________

20.11 Goals & Strategic Objectives

Rank your top priorities for implementing Kav AI (1 = highest priority, 12 = lowest):

Objective Priority (1-12)
Reduce fugitive methane emissions (EPA/LDAR compliance)
Prevent pipeline rupture and product leaks
Minimize unplanned pump/compressor downtime
Improve flare stack combustion efficiency monitoring
Reduce control room operator alarm fatigue
Elevate safety during extreme weather events (freeze-offs)
Track tank roof and seal integrity using thermal imaging
Extend the operating life of legacy assets
Centralize visibility across multi-basin, distributed assets
Enable predictive maintenance on rotating machinery
Transition from manual visual rounds to automated AI exceptions
Build an interactive 3D digital twin of processing plants

20.12 Regulatory Compliance

Check all applicable environmental, health, and safety regulatory requirements:


20.13 IT & Enterprise Integration

  • Enterprise Asset Management (EAM) / CMMS (e.g., SAP PM, IBM Maximo): __________________________________________________________________________

  • Geographic Information System (GIS) (e.g., Esri ArcGIS): __________________________________________________________________________

  • Laboratory Information Management System (LIMS) (for gas/crude assays): __________________________________________________________________________

  • Do you require Single Sign-On (SSO) integration (SAML 2.0 / OIDC)? __________________________________________________________________________


20.14 Proposed Pilot Scope

Help us define a highly focused pilot deployment to demonstrate immediate value:

  • Target Pilot Location (e.g., West Texas Gathering Block A, Refining Unit 4): __________________________________________________________________________

  • Primary Asset(s) to Monitor (e.g., 3 compressors, 5 storage tanks, 12 wellheads): __________________________________________________________________________

  • Specific Problem to Solve in the Pilot: (e.g., “Detect fugitive methane leaks on unstaffed pads within 30 minutes of occurrence”) __________________________________________________________________________

  • Target Start Date & Proposed Pilot Duration (e.g., 90 days): __________________________________________________________________________

  • Key Stakeholders for Pilot Evaluation: __________________________________________________________________________


20.15 Submission & Sign-off

By submitting this onboarding questionnaire, I confirm that the information provided represents our operational goals and infrastructure to the best of my knowledge.

  • Printed Name & Title: __________________________________________________
  • Authorized Signature: __________________________________________________
  • Date: __________________________

Please return the completed document to your Kav AI Solutions Architect at info@kavai.com.