Kav AI Platform — Capability Progress

Rows = capabilities · columns = milestones (left→right is time) · blocks = high-level milestone outcomes. Use each block's requirements link to inspect the FR IDs and descriptions.

61 requirements · 5 capabilities + 4 cross-cutting concerns · 11 delivered · 8 in progress (q2) · 17 q3 target · 2 q3 / q4 target · 13 q4 target · 3 research-gated · 7 h1 2027 roadmap · generated from _data/{capabilities,requirements,milestones}.yaml

DeliveredIn progress (Q2)Q3 targetQ3 / Q4 targetQ4 targetResearch-gatedH1 2027 roadmapCritical (✦)Research-gated
capability ↓ / milestone →
M0
Platform Foundation
Jul 2025
done
M1
AI Foundation
Dec 2025
done
M2
App MVP
Mar 2026
done
M3
AI Q2 Delivery
Jun 2026
active
M4
Persistent Sensing
Q3 2026
planned
M5
Engineering Context & E…
Q4 2026
planned
H1 2027
Roadmap horizon
H1 2027
planned
Evidence Intake
2/12 in motion

This block achieved the capability through RGB inspection imagery ingestion — EXIF / GPS provenance & dataset scoping.

Status: Delivered.

View 1 requirement

This block achieved the capability through Multimodal evidence pipeline foundation — thermal / OGI / gas ingest (prototype).

Status: Delivered.

View 1 requirement

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through OGI sensor ingestion; Calibrated thermal ingestion; Gas sensor ingestion.

Status: Q3 Target.

View 3 requirements

This block advances the capability through OPC UA SCADA connector.

Status: Q4 Target.

View 1 requirement

This block advances the capability through Full spatial navigation; KRSI robot ingestion adapter; Fixed infrastructure: navigation beacons; Fixed infrastructure: communication backbone; Coverage orchestration; Fleet intelligence analytics.

Status: H1 2027 Roadmap.

View 6 requirements
World Model
3/10 in motion

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through CAD geometry via open IFC4 (BIM STEP) standard; DEXPI open-standard P\&ID ingestion (equipment, nozzles, piping, connectivity); Deterministic dual-tagging (legacy CAD ↔ operator / DEXPI tags) with asset cross-reference; Geo-tagge….

Status: In Progress (Q2), Q3 Target.

View 4 requirements

This block advances the capability through CAD version tracking and diff visualization; As-built vs as-designed comparison; Engineering change notification; Additional CAD formats (RVT / DGN) beyond IFC4; P\&ID database (SQL) connector — direct read (distinct from DEXPI i….

Status: Q4 Target.

View 6 requirements

No formal requirement is scheduled in this milestone block.

Evidence Confidence
0/10 in motion

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through Filter Skill calibration & FNR measurement; Confidence score calibration protocol; Chain-level consistency gate (Stage 3.5); OOD detector update cadence; Cross-modal anomaly detection; Cross-source correlation engine — promoted t….

Status: Q3 / Q4 Target, Q3 / Q4 Target (research-gated), Q3 Target.

View 6 requirements

This block advances the capability through Physical AI reasoning & remediation; Cross-source correlation engine; Synthetic data generation; Multi-source confirmed TPR > 98% / FPR < 2% target reporting.

Status: Q4 Target, Q4 Target (research-gated).

View 4 requirements

No formal requirement is scheduled in this milestone block.

Integrity Analytical Chain
0/3 in motion

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through Solomon Associates benchmarking; API 581 inspection interval calculation; Equipment class boundary of automation.

Status: Q3 / Q4 Target, Q3 Target.

View 3 requirements

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

Operator Handoff
1/5 in motion

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block achieved the capability through Work-order / recommendation export — markdown + CSV.

Status: Delivered.

View 1 requirement

No formal requirement is scheduled in this milestone block.

This block advances the capability through Automated reports; IDMS bidirectional integration specification; Partner-integrated delivery model — single procurement vehicle, partner-provided HITL seat.

Status: Q3 Target.

View 3 requirements

This block advances the capability through SAP PM certified connector.

Status: Q4 Target.

View 1 requirement

No formal requirement is scheduled in this milestone block.

Cross-cutting concerns — runtime profiles, application surface & programs that span the capabilities (the detached series, not product modules)
capability ↓ / milestone →
M0
Platform Foundation
Jul 2025
done
M1
AI Foundation
Dec 2025
done
M2
App MVP
Mar 2026
done
M3
AI Q2 Delivery
Jun 2026
active
M4
Persistent Sensing
Q3 2026
planned
M5
Engineering Context & E…
Q4 2026
planned
H1 2027
Roadmap horizon
H1 2027
planned
Application Surface
12/15 in motion

This block achieved the capability through Web-based 3D inspection viewer (Cesium geospatial scene); Operator dashboard — organization / campaign / anomaly overview; Visual defect gallery — geo-tagged imagery, annotations & anomaly bounding boxes.

Status: Delivered.

View 3 requirements

This block achieved the capability through First-generation AI chat assistant — natural-language query over inspection data (early, not-yet-reliable prototype); Automated agentic task coordination — multi-agent orchestration (planner / executor, tool routing); Gas measure….

Status: Delivered.

View 3 requirements

This block achieved the capability through Provenance-cited chat answers — citations & tool-execution timeline.

Status: Delivered.

View 1 requirement

This block is actively maturing the capability through Contextual data chat Ph.0 — single-turn NL query (classify → SQL execute → report) over workspace data; Agent failure recovery — Supabase RLS/timeout, Gemini rate-limit/timeout, JWT expiry, and blob-storage retry handled without….

Status: In Progress (Q2).

View 5 requirements

This block advances the capability through Contextual data chat Ph.1; Chat with 3D map; Interactive overlays.

Status: Q3 Target.

View 3 requirements

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

Security & Compliance
1/3 in motion

This block achieved the capability through Multi-tenant authentication & workspace access control.

Status: Delivered.

View 1 requirement

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through SOC 2 Type II certification; Compliance management.

Status: Q4 Target.

View 2 requirements

No formal requirement is scheduled in this milestone block.

Deployment Profile
0/2 in motion

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through Customer cloud tenant deployment.

Status: Q4 Target.

View 1 requirement

This block advances the capability through Dose-aware inspection workflow.

Status: H1 2027 Roadmap.

View 1 requirement
Commercial / GTM
0/1 in motion

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

This block advances the capability through Reference partnership — OI.Expert × Kav AI integrated proposal template.

Status: Q3 Target.

View 1 requirement

No formal requirement is scheduled in this milestone block.

No formal requirement is scheduled in this milestone block.

The five deep modules that every requirement classifies under (what each one owns), plus the cross-cutting concerns. Sourced from _data/capabilities.yaml.

Evidence Intake

normalized evidence, QC, provenance, timestamp alignment

inbound — carriers: drone, ground/crawler robot, fixed install, handheld/manual; modalities: RGB imagery, thermal IR, OGI, gas readings, UT thickness; plant systems: SCADA / OPC UA (read-only)
World Model

asset identity, spatial registration, tag reconciliation, engineering context, photorealistic 3D scene (3DGS), AI assistant brain (persistent memory and knowledge)

inbound — reality capture: 3D Gaussian Splatting (3DGS), 3D Tiles, point clouds; 3d cad: IFC4, RVT, DGN; pid: DEXPI, P&ID SQL
Evidence Confidence

cross-source correlation, contradiction, consistency, calibrated confidence

adapters — model evaluators, Filter Skill inputs
Integrity Analytical Chain

observed anomaly -> damage-mechanism review -> risk assessment -> inspection-plan reasoning

adapters — industry integrity standards (API 571/581/584 in hydrocarbons; ISO 31000 / sector equivalents elsewhere), RAM benchmarking (e.g. Solomon)
Operator Handoff

verification queue, recommendation packets, inspection plan handoff

outbound — CMMS, IDMS, SAP PM, partner review
Cross-cutting concerns — runtime profiles, application surface & programs that span the capabilities
Application Surface

3D viewer, contextual data-chat, interactive overlays (the Data Source Registry query seam, ADR-001)

Security & Compliance

certifications, compliance management, access control

Deployment Profile

runtime profiles over the capabilities — SaaS, customer tenant, air-gapped, high-hazard

Commercial / GTM

partner-integrated delivery, proposal templates, MVP demonstration program

The gate criteria for each milestone — the product and technical bar that had to be met to close it. Left→right is time (M0→M4); status mirrors the progress matrix.

M0Platform FoundationJul 2025done
Product gate

3D Viewer + Authentication + Image Gallery + Operator Dashboard, validated on first real-world RGB inspection dataset

Technical gate

Web-Based 3D Viewer + Multi-Tenant Auth + Operator Dashboard + Visual Defect Gallery

M1AI FoundationDec 2025done
Product gate

Multimodal AI Pipeline + Natural Language Interface + Automated Task Coordination + Machine Vision Engine prototype, validated with thermal imagery and gas sensor readings

Technical gate

Multimodal AI Pipeline + Natural Language Chat + Automated Agentic Coordination + On-Demand Defect Detection

M2App MVPMar 2026done
Product gate

Unified 3D Viewer + AI Chat operator interface; Avoided-Cost Pilot case study (MVP v0.2)

Technical gate

3D Viewer + AI Chat functional

M3AI Q2 DeliveryJun 2026active
Product gate

MVP v0.3 — Contextual data chat in persona-tailored workspaces (Data Explorer & Integrity Engineer); validated agent reliability (evaluation tests + failure recovery)

Technical gate

Contextual Data Chat + Failure Recovery + Agent Evaluation Tests

M4Persistent SensingQ3 2026planned
Product gate

MVP v0.4 Closed-Loop Intelligence (Q3 increment) + CAD/P&ID Engineering Context; Quantified Inspection Prioritization; RBI/IDMS Workflow Integration; Persona Sign-off (IE & DE); ROI Calculator

Technical gate

Multi-Sensor Automated Detection + CAD (IFC) Ingestion & P&ID Tag-Linkage + Geo-Tagged Spatial Anchoring + Contextual Chat Phase 1

M5Engineering Context & EnterpriseQ4 2026planned
Product gate

Engineering-context depth + enterprise readiness; 10 Signed Letters of Intent (LOIs); SOC 2 Type II Sign-off; First 3 Production Subscriptions; On-Prem/Air-Gapped Package

Technical gate

SCADA/OPC UA Connectors + IOW Checks + 3D CAD Model Overlay + P&ID SQL Connector + SOC 2 Type II + Compliance Management + Air-Gapped Deployment

Canonical ledger: _data/milestones.yaml · beyond M4 lies the H1 2027 roadmap horizon.

Source of truth: docs/portfolio/_data/. Regenerate with python docs/portfolio/_build/generate_progress_table.py (guarded by lint_consistency.check_progress_table).